Planning application · EDI/25/02427/FUL
New two-storey fire station and vehicle store proposed on Kirk Brae.
Liberton Fire Station 19 Kirk Brae Edinburgh EH16 6HH
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- New-Build & Major Development
- Medium 6/10
- Ancillary Structure
- Landscaping
- Parking Access
Overview
Why it’s worth watching
New-build fire station replacing/modernising a public civic asset with associated vehicle store and site works.
- Today
- Fire station; 14 vehicle parking spaces.
- Proposed
- Two-storey fire station, two-bay vehicle store and 17 vehicle parking spaces.
- Size
- 1,450 m² proposed floorspace · 3,990 m² site area
- Stage
- Decided: Application Granted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought permission for a new two-storey fire station, an adjacent two-bay vehicle store and landscaping around the building. The site is currently used as a fire station. The proposal includes 1,450 square metres of non-residential floorspace and changes to the vehicle access. The council has granted the application.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EDI/25/02427/FUL?
Follow it on City Scope. This page is checked against the City of Edinburgh Council planning register and shows the latest status, decision and documents for EDI/25/02427/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the City of Edinburgh Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposed fire station would be two storeys high.
- 02
A two-bay vehicle store would be built beside the fire station.
- 03
A new or altered vehicle access to a public road is proposed.
- 04
Hard and soft landscaping is proposed around the building perimeter.
Questions
What is planned for the site?
A new two-storey fire station, an adjacent two-bay vehicle store and landscaping around the building.
Was there earlier planning advice?
The form refers to pre-application advice under reference 24/05443/PREAPP for a replacement Liberton Fire Station.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Landscaping
- Ancillary Structure
- Parking Access
What each tag is based on
- Ancillary Structure
- “description":"adjacent two bay vehicle store"”
- Landscaping
- “description":"and associated hard and soft landscaping to the building perimeter"”
- Parking Access
- “description":"adjacent two bay vehicle store"”
All documents (5)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received12 May 2025
- Validated22 May 2025The council has everything it needs.
- Comments closed12 Jun 2025Usual deadline. Late comments may still count.
- Target decision22 Jul 20252-month target for local developments.
- DecisionApplication Granted
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- EDI/25/02427/FUL
- Address
- Liberton Fire Station 19 Kirk Brae Edinburgh EH16 6HH
- Status
- Application Granted
- Category
- New-Build & Major Development
- Impact scale
- 6/10
- Authority
- The City of Edinburgh Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Liberton/Gilmerton
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.




