CityScope · Planning Updates
Application 25/04194/CLP
Institute Of Regeneration And Repair 4 - 5 Little France Drive Inch Edinburgh EH16 4U
Ballasted galvanised railings and Kee Walk guardrail proposed around roof perimeter for safer maintenance access; no changes to building massing. .
The record
- Reference
- 25/04194/CLP
- Address
- Institute Of Regeneration And Repair 4 - 5 Little France Drive Inch Edinburgh EH16 4U
- Status
- Application Granted
- Category
- Roof Works & Dormers
- Impact scale
- 2/10
- Authority
- Local authority
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.92106
- Longitude
- -3.130032
What is proposed
Plain-language summary
Ballasted galvanised railings and Kee Walk guardrail proposed around roof perimeter for safer maintenance access; no changes to building massing. .
As filed with the council
Installation of ballasted roof edge protection. All proprietary systems, galvanised steel railings, recycled uPVC ballast counter weights. Installation of KEE walk with guardrail (or equal & approved). Installation only for maintenance purposes.
