Overview
Why it’s worth watching
A 200MW battery energy storage scheme with associated substation and infrastructure is large infrastructure with material local consequence.
- Proposed
- A battery energy storage system, associated substation and infrastructure
- Stage
- Council responded on 18 Mar 2026: No Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is a consultation under Section 36 of the Electricity Act 1989 for a battery energy storage system with installed capacity of up to 200MW. It also covers an associated substation and infrastructure. The record says the application is decided but gives no decision outcome.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1059?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1059. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A battery energy storage system would be installed on land surrounding Womble Hill Farm.
- 02
An associated substation and infrastructure are included.
Tags
- Electrical Infrastructure
- Renewable Energy Infrastructure
- Section 36 Consent
- Substation
What each tag is based on
- Electrical Infrastructure
- “Associated Substation and Infrastructure”
- Renewable Energy Infrastructure
- “Installation of Battery Energy Storage System (BESS)”, “Installed Capacity of up to 200MW”
- Section 36 Consent
- “Consultation under Section 36 of the Electricity Act 1989”
- Substation
- “Associated Substation and Infrastructure”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 18 March 2026.
- Received30 Jun 2025
- Validated30 Jun 2025The council has everything it needs.
- Comments closed21 Jul 2025Usual deadline. Late comments may still count.
- Target decision30 Aug 20252-month target for local developments.
- Decision18 Mar 2026No Objection.
The record
- Reference
- ABS/APP/2025/1059
- Address
- Land Surrounding Womble Hill Farm Kintore Aberdeenshire AB51 0XJ
- Status
- Decided
- Council decision
- No Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- East Garioch
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.