Planning application · ABS/APP/2025/1213
Battery storage system of up to 400MW proposed north of Longside Road.
Land North Of Longside Road Flushing Peterhead Aberdeenshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
Overview
Why it’s worth watching
The application is a Section 36 Electricity Act consultation for a 400MW BESS with associated infrastructure, representing significant energy development scale and local infrastructure change near Peterhead.
- Proposed
- A battery energy storage system with an installed capacity of up to 400MW and associated infrastructure
- Stage
- Council responded on 20 Feb 2026: No Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is a consultation under Section 36 of the Electricity Act 1989 for a battery energy storage system (BESS) with an installed capacity of up to 400MW and associated infrastructure. The site is land north of Longside Road, Flushing, Peterhead. The record gives no details of the decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1213?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1213. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A battery energy storage system and associated infrastructure are proposed on land north of Longside Road.
Questions
What does BESS mean?
BESS means battery energy storage system.
What decision was made?
The record says the application is decided but does not give the decision.
Tags
- Associated Infrastructure
- Section 36 Consent
What each tag is based on
- Associated Infrastructure
- “Associated Infrastructure”, “associated grid and energy infrastructure works”
- Section 36 Consent
- “Section 36 of the Electricity Act 1989”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 20 February 2026.
- Received24 Jul 2025
- Validated24 Jul 2025The council has everything it needs.
- Comments closed14 Aug 2025Usual deadline. Late comments may still count.
- Target decision24 Sept 20252-month target for local developments.
- Decision20 Feb 2026No Objection.
The record
- Reference
- ABS/APP/2025/1213
- Address
- Land North Of Longside Road Flushing Peterhead Aberdeenshire
- Status
- Decided
- Council decision
- No Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







