Application ABS/APP/2025/1262
Land Circa 200M West Of Greystone Peterhead Aberdeenshire AB42 3JP
Plans submitted for a large Battery Energy Storage System (BESS) up to 500MW with associated infrastructure under Section 36 consultation.
The record
- Reference
- ABS/APP/2025/1262
- Address
- Land Circa 200M West Of Greystone Peterhead Aberdeenshire AB42 3JP
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.473
- Longitude
- -1.8474
What is proposed
Plain-language summary
Plans submitted for a large Battery Energy Storage System (BESS) up to 500MW with associated infrastructure under Section 36 consultation.
As filed with the council
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with a Generating Capacity of up to 500MW and Associated Infrastructure