Planning application · ABS/APP/2025/1262
Battery storage with capacity up to 500MW proposed near Peterhead.
Land Circa 200M West Of Greystone Peterhead Aberdeenshire AB42 3JP
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
Overview
Why it’s worth watching
A 500MW battery energy storage system consultation near Peterhead is a major energy infrastructure proposal with clear public and landscape relevance.
- Proposed
- A battery energy storage system with generating capacity of up to 500MW and associated infrastructure
- Stage
- Council responded on 28 Nov 2025: No Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is a consultation under Section 36 of the Electricity Act 1989. It concerns a battery energy storage system with generating capacity of up to 500MW and associated infrastructure on land about 200 metres west of Greystone, Peterhead.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1262?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1262. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A battery energy storage system and associated infrastructure are proposed on land about 200 metres west of Greystone.
Tags
- Associated Infrastructure
- Section 36 Consent
What each tag is based on
- Associated Infrastructure
- “Associated Infrastructure”
- Section 36 Consent
- “Section 36 of the Electricity Act 1989”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 28 November 2025.
- Received31 Jul 2025
- Validated31 Jul 2025The council has everything it needs.
- Comments closed21 Aug 2025Usual deadline. Late comments may still count.
- Target decision1 Oct 20252-month target for local developments.
- Decision28 Nov 2025No Objection.
The record
- Reference
- ABS/APP/2025/1262
- Address
- Land Circa 200M West Of Greystone Peterhead Aberdeenshire AB42 3JP
- Status
- Decided
- Council decision
- No Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Peterhead South and Cruden
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







