Application ABS/APP/2025/1555
Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
Consultation for a large BESS battery storage site up to 400MW with associated works and screened development.
The record
- Reference
- ABS/APP/2025/1555
- Address
- Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.4985
- Longitude
- -1.9062
What is proposed
Plain-language summary
Consultation for a large BESS battery storage site up to 400MW with associated works and screened development.
As filed with the council
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 400MW and Associated Works