Planning applicationABS/APP/2025/1555

Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

19 September 2025

Validated

19 September 2025

Planning Signals

2 detected traits

Specific
Associated InfrastructureSection 36 Consent
AI summary

Consultation for a large BESS battery storage site up to 400MW with associated works and screened development.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2025/1555

Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Consultation for a large BESS battery storage site up to 400MW with associated works and screened development.

Reference
ABS/APP/2025/1555
Address
Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.4985
Longitude
-1.9062

Plain-language summary

Consultation for a large BESS battery storage site up to 400MW with associated works and screened development.

As filed with the council

Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 400MW and Associated Works