Skip to content

Planning application · ABS/APP/2025/2060

ABS/APP/2025/2060Awaiting decisionWorth watching

150000 sq m of onshore electricity infrastructure proposed near Longside.

MarramWind Offshore Wind Farm Land Between Mean Low Water Springs At Lunderton and Scotstown Beach To The East Of Longside Peterhead

Aberdeenshire Council

Free with a City Scope account. One email, when the council decides.

Also email me new applications nearby · £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 8/10
Tags
  • Associated Infrastructure
  • Offshore Wind Farm
  • Renewable Energy Infrastructure
  • Substation
  • Underground Cable Route Works

Overview

Why it’s worth watching

A major offshore wind farm's onshore grid connection, cabling and substation infrastructure is significant energy infrastructure with wide public and environmental relevance.

Today
Primarily agricultural land, with open space, woodland and recreational areas.
Proposed
Onshore electricity transmission infrastructure, including landfall works, underground cables and substations.
Size
150,000 m² proposed floorspace · 760 ha site area
Stage
Past its target date of 20 May 2026.

The council writes only to properties within 20 metres of an application site. Who is told

Ppip application figure 1.5 site plan proposed

In plain English

This is an application for planning permission in principle, which seeks approval for a development in broad terms before its detailed design is settled. It proposes onshore infrastructure for the MarramWind Offshore Wind Farm, including landfall works, underground cables, substations and associated works to connect to the electricity grid at SSEN’s Netherton Hub. The site is described as mainly agricultural land, with some open space, woodland and recreational areas, including the north western edge of Peterhead Golf Course.

Written with AI from the application form and the council record.

Keep reading

Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application ABS/APP/2025/2060?

Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/2060. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Aberdeenshire Council planning portal.