Planning application · ABS/APP/2026/0300
114 ground-mounted solar panels proposed at Meadows Sports Centre.
Meadows Sports Centre Meadows Way Ellon Aberdeenshire AB41 9QJ
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Associated Infrastructure
- Ground Mounted Solar Panels
Overview
- Today
- Unused grass banking between sports pitches
- Proposed
- 50kWp ground-mounted solar photovoltaic system with 114 panels
- Size
- 114 panels solar panels · 50 kWp system capacity · 0.03 ha site area
- Stage
- Decided on 11 May 2026: Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application was for a ground-mounted solar photovoltaic array with a stated capacity of 50kWp at Meadows Sports Centre. The site is described as unused grass banking between sports pitches, and the form says there would be no change of use. The application was approved.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2026/0300?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2026/0300. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A ground-mounted solar photovoltaic array with 114 panels is proposed on unused grass banking between the sports pitches.
Questions
Has the application been decided?
Yes. The application was approved.
Would the proposal change access or parking?
The form says there would be no change to vehicle access or public paths. It lists 100 parking spaces currently and 100 proposed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Ground Mounted Solar Panels
What each tag is based on
- Associated Infrastructure
- “Installation of Ground Mounted Solar Photovoltaic Array and Associated Infrastructure”
- Ground Mounted Solar Panels
- “Installation of Ground Mounted Solar Photovoltaic Array”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 11 May 2026.
- Received20 Feb 2026
- Validated11 Mar 2026The council has everything it needs.
- Comments closed1 Apr 2026Usual deadline. Late comments may still count.
- Target decision11 May 20262-month target for local developments.
- Decision11 May 2026Approved.
Planning terms
- Change of use
- Permission to use a building for a different purpose, for example offices to a hotel.
The record
- Reference
- ABS/APP/2026/0300
- Address
- Meadows Sports Centre Meadows Way Ellon Aberdeenshire AB41 9QJ
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Ellon and District
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





