Planning applicationABS/APP/2026/0732

Land To East Of Upper Culphin Cornhill Banff

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

30 April 2026

Validated

8 May 2026

Planning Signals

1 detected trait

Specific
Wind Turbine
Application Insights

No form insights available yet.

AI summary

Proposed replacement wind turbine with 45m hub height and 68.5m tip height, plus associated infrastructure at the existing site.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/0732

Land To East Of Upper Culphin Cornhill Banff

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Proposed replacement wind turbine with 45m hub height and 68.5m tip height, plus associated infrastructure at the existing site.

Reference
ABS/APP/2026/0732
Address
Land To East Of Upper Culphin Cornhill Banff
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.6186
Longitude
-2.6579

Plain-language summary

Proposed replacement wind turbine with 45m hub height and 68.5m tip height, plus associated infrastructure at the existing site.

As filed with the council

Erection of Replacement Wind Turbine (Hub Height 45 metres) Total Height 68.5 metres and Associated Infrastructure