CityScope · Planning Updates
Application ABS/APP/2025/1895
Hilton Park Banff Aberdeenshire AB45 3AP
Replacement wind turbine proposed at Hilton Park, with hub height around 31.5m and total height up to about 45m, plus supporting infrastructure.
The record
- Reference
- ABS/APP/2025/1895
- Address
- Hilton Park Banff Aberdeenshire AB45 3AP
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.6289
- Longitude
- -2.6006
What is proposed
Plain-language summary
Replacement wind turbine proposed at Hilton Park, with hub height around 31.5m and total height up to about 45m, plus supporting infrastructure.
As filed with the council
Erection of Replacement Wind Turbine (Hub Height 31.548 metres) Total Height 45 metres and Associated Infrastructure
