Why it’s worth watching
Application APP/2026/1202 proposes two replacement wind turbines with 30-metre hub height and 43.5-metre total height plus associated infrastructure at Mill of Auchlin, New Aberdour.
- Today
- Two operational wind turbines on agricultural grassland
- Proposed
- Two replacement turbines, foundations, GRP units and an extended access track
- Size
- 43.5 metres proposed turbine height · 34.5 metres existing turbine tip height · 5.63 ha site area
- Stage
- Past its target date of 16 Nov 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes replacing two existing wind turbines with two taller turbines, along with foundations, GRP units and an extension to the existing access track. The existing turbines have a tip height of 34.5 metres; the proposed turbines would have a total height of 43.5 metres. The work has not started, and the application is awaiting a decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2026/1202?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2026/1202. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Aberdeenshire Council planning portal.
On the street
What neighbours would notice.
- 01
Two replacement wind turbines are proposed, with a total height of 43.5 metres.
- 02
The existing access track would be extended.
- 03
Associated foundations and GRP units are proposed.
Questions
What is proposed?
The application seeks permission to replace the two existing wind turbines and build associated foundations and GRP units, with an extension to the access track.
Has the work started?
No. The form says the work has not started or been completed.
What happens next?
The application is awaiting a decision from Aberdeenshire Council.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”
- Wind Turbine
- “Erection of 2 Replacement Wind Turbines”
- Wind Turbine Count 2
- “2 Replacement Wind Turbines”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received14 Jul 2026
- Validated16 Jul 2026The council has everything it needs.
- Comments closed6 Aug 2026Usual deadline. Late comments may still count.
- Target decision (next)16 Nov 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- ABS/APP/2026/1202
- Address
- Mill Of Auchlin New Aberdour Aberdeenshire AB43 7LL
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Troup
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.