CityScope · Planning Updates
Application ABS/ENQ/2025/0847
Land To The West Of Greystone Blackhills Peterhead Aberdeenshire AB42 3JP
A major battery energy storage facility of up to 500MW could be installed, with associated infrastructure and site works.
The record
- Reference
- ABS/ENQ/2025/0847
- Address
- Land To The West Of Greystone Blackhills Peterhead Aberdeenshire AB42 3JP
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.473
- Longitude
- -1.8474
What is proposed
Plain-language summary
A major battery energy storage facility of up to 500MW could be installed, with associated infrastructure and site works.
As filed with the council
Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 500MW and Associated Works