Planning application · ABS/ENQ/2025/0847
Battery storage system of up to 500MW proposed near Peterhead.
Land To The West Of Greystone Blackhills Peterhead Aberdeenshire AB42 3JP
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
Overview
Why it’s worth watching
The installation of a Battery Energy Storage System with up to 500MW capacity represents a major infrastructure proposal with potential regional energy implications.
- Proposed
- A battery energy storage system with an installed capacity of up to 500MW and associated works.
- Stage
- Decided on 7 Jul 2025: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a battery energy storage system (BESS), which stores electricity in batteries, with an installed capacity of up to 500MW. Associated works are also proposed.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2025/0847?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2025/0847. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A battery energy storage system and associated works are proposed on land to the west of Greystone Blackhills.
Tags
- Associated Infrastructure
What each tag is based on
- Associated Infrastructure
- “and Associated Works”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 7 July 2025.
- Received16 Jun 2025
- Validated16 Jun 2025The council has everything it needs.
- Comments closed7 Jul 2025Usual deadline. Late comments may still count.
- Target decision16 Aug 20252-month target for local developments.
- Decision7 Jul 2025EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2025/0847
- Address
- Land To The West Of Greystone Blackhills Peterhead Aberdeenshire AB42 3JP
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Peterhead South and Cruden
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.