Fetteresso Substation Fetteresso Stonehaven Aberdeenshire AB39 3UX

DecidedWorth watchingMechanical Plant, Flues & Ventilation
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

8 July 2025

Validated

10 July 2025

Planning Signals

6 detected traits

Specific
Access RoadsCivil WorksDrainage Wastewater InfrastructureElectrical InfrastructureForestry Access TrackSubstation
AI summary

Fetteresso substation upgrade: GIS switchgear and a new control building plus drainage, track resurfacing/widening and earthworks to the existing forestry access.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2025/1000

Fetteresso Substation Fetteresso Stonehaven Aberdeenshire AB39 3UX

DecidedMechanical Plant, Flues & VentilationReceived Aberdeenshire Council

Fetteresso substation upgrade: GIS switchgear and a new control building plus drainage, track resurfacing/widening and earthworks to the existing forestry access.

Reference
ABS/ENQ/2025/1000
Address
Fetteresso Substation Fetteresso Stonehaven Aberdeenshire AB39 3UX
Status
Decided
Category
Mechanical Plant, Flues & Ventilation
Impact scale
6/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
56.952791
Longitude
-2.344953

Plain-language summary

Fetteresso substation upgrade: GIS switchgear and a new control building plus drainage, track resurfacing/widening and earthworks to the existing forestry access.

As filed with the council

Installation of Combined Gas Insulated Switchgear (GIS) and Control Building, Associated Drainage, Modifications (Re-Surfacing, Widening Including Drainage Works and Passing Places) to a Section of the Existing Private Forestry Access Track, and Associated Earthworks at the Existing Substation