Planning applicationABS/ENQ/2025/1385

Land South Of Upper Mains Farm Turriff

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

19 September 2025

Validated

19 September 2025

Planning Signals

2 detected traits

Specific
Associated InfrastructureWind Turbine
AI summary

Erect a wind turbine with 46m hub height, 77m total height, plus associated infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2025/1385

Land South Of Upper Mains Farm Turriff

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Erect a wind turbine with 46m hub height, 77m total height, plus associated infrastructure.

Reference
ABS/ENQ/2025/1385
Address
Land South Of Upper Mains Farm Turriff
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.5278
Longitude
-2.4879

Plain-language summary

Erect a wind turbine with 46m hub height, 77m total height, plus associated infrastructure.

As filed with the council

Erection of Wind Turbine (Hub Height 46m, Total Height 77m) and Associated Infrastructure