Overview
Why it’s worth watching
Proposed synchronous condenser facility and high-voltage cable connection to Rothienorman Substation is grid infrastructure of meaningful local scale.
- Proposed
- Synchronous condenser facility, associated infrastructure and underground cable connection
- Stage
- Decided on 26 Aug 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a synchronous condenser facility and associated infrastructure at Land at Overhill, including a high-voltage underground cable connection to Rothienorman Substation. The council’s recorded decision is “EIA Opinion Adopted”; the record does not say that planning permission was granted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/0828?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/0828. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A synchronous condenser facility and associated infrastructure are proposed at the site.
- 02
A high-voltage underground cable connection to Rothienorman Substation is proposed.
Questions
What does “EIA Opinion Adopted” mean here?
That is the decision recorded for this application. The record does not give further details of the opinion.
Tags
- Associated Infrastructure
- Electrical Infrastructure
- Substation Connection Works
What each tag is based on
- Associated Infrastructure
- “Associated Infrastructure”
- Electrical Infrastructure
- “Synchronous Condenser Facility”, “High Voltage Underground Cable Connection”
- Substation Connection Works
- “connection to Rothienorman Substation”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 26 August 2026.
- Received19 May 2026
- Validated19 May 2026The council has everything it needs.
- Comments closed9 Jun 2026Usual deadline. Late comments may still count.
- Target decision19 Jul 20262-month target for local developments.
- Decision26 Aug 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/0828
- Address
- Land At Overhill Rothienorman Aberdeenshire AB51 8YN
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- New-Build & Major Development
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Turriff and District
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.