Planning application · ABS/ENQ/2026/0840
Salamander offshore wind farm substation connection proposed.
Salamander Offshore Wind Farm
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Offshore Wind Farm
- Overhead Utility Lines
- Renewable Energy Infrastructure
- Substation Connection Works
Overview
Why it’s worth watching
Offshore wind farm substation grid connection is major energy infrastructure, but evidence is thin as an enquiry with no documents.
- Today
- An existing Peterhead to St Fergus 132KV overhead line.
- Proposed
- A connection from the Salamander Offshore Wind Farm substation to that line.
- Stage
- Decided on 25 Jun 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is to connect the Salamander Offshore Wind Farm substation to the existing Peterhead to St Fergus 132KV overhead line (OHL), meaning an overhead electricity line. The council record says an EIA Opinion was adopted; it does not give further details of that opinion.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/0840?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/0840. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A connection from the substation to the existing overhead line is proposed; the description does not say where the connection would be made.
Questions
What decision does the council record?
It records that an EIA Opinion was adopted. It does not state that planning permission was granted.
Tags
- Offshore Wind Farm
- Overhead Utility Lines
- Renewable Energy Infrastructure
- Substation Connection Works
What each tag is based on
- Offshore Wind Farm
- “Salamander Offshore Wind Farm”
- Overhead Utility Lines
- “Existing Peterhead to St Fergus 132KV OHL”
- Renewable Energy Infrastructure
- “Salamander Offshore Wind Farm”
- Substation Connection Works
- “Connection of Salamander Offshore Wind Farm Substation”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 25 June 2026.
- Received20 May 2026
- Validated20 May 2026The council has everything it needs.
- Comments closed10 Jun 2026Usual deadline. Late comments may still count.
- Target decision20 Jul 20262-month target for local developments.
- Decision25 Jun 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/0840
- Address
- Salamander Offshore Wind Farm
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.