Up to 13 wind turbines proposed at Clashmach Hill.
Land At Clashmach Hill Southwest Of Huntly
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Associated Works
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
A large wind-energy proposal has a newly verified adopted scoping opinion that raises concrete grid-connection and cross-boundary landscape questions; this remains an assessment stage, not consent.
- Proposed
- Up to 13 wind turbines, access track and associated infrastructure
- Size
- 200 m height to blade tip
- Stage
- Decided on 6 Aug 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes up to 13 wind turbines, with access tracks and associated infrastructure, on land at Clashmach Hill southwest of Huntly. The record says the council adopted an EIA Opinion; it does not say that planning permission was granted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/1032?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/1032. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Up to 13 wind turbines, reaching 200m to blade tip, are proposed.
- 02
An access track and associated infrastructure are proposed.
Questions
What decision does the record show?
It says “EIA Opinion Adopted”. It does not state that planning permission was granted.
Tags
- Associated Infrastructure
- Associated Works
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- ““Formation of Access Track and Associated Infrastructure””
- Associated Works
- ““Formation of Access Track and Associated Infrastructure””
- Wind Turbine
- ““Erection of up 13 Wind Turbines (200m to Blade Tip)””, ““Up to 13 wind turbines (to 200m blade tip)””
- Wind Turbine Count 13 Or Up To 13
- ““Erection of up 13 Wind Turbines (200m to Blade Tip)””, ““Up to 13 wind turbines””
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 6 August 2026.
- Received16 Jun 2026
- Validated19 Jun 2026The council has everything it needs.
- Comments closed10 Jul 2026Usual deadline. Late comments may still count.
- Target decision19 Aug 20262-month target for local developments.
- Decision6 Aug 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/1032
- Address
- Land At Clashmach Hill Southwest Of Huntly
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.