Planning applicationABS/ENQ/2026/1032

Land At Clashmach Hill Southwest Of Huntly

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

16 June 2026

Validated

19 June 2026

Planning Signals

4 detected traits

Specific
Associated InfrastructureAssociated WorksWind TurbineWind Turbine Count 13 Or Up To 13
AI summary

Up to 13 wind turbines (to 200m blade tip), with new access track and associated on-site infrastructure at Dunscroft Wind Farm.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/1032

Land At Clashmach Hill Southwest Of Huntly

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Up to 13 wind turbines (to 200m blade tip), with new access track and associated on-site infrastructure at Dunscroft Wind Farm.

Reference
ABS/ENQ/2026/1032
Address
Land At Clashmach Hill Southwest Of Huntly
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.4289
Longitude
-2.8439

Plain-language summary

Up to 13 wind turbines (to 200m blade tip), with new access track and associated on-site infrastructure at Dunscroft Wind Farm.

As filed with the council

Erection of up 13 Wind Turbines (200m to Blade Tip) Formation of Access Track and Associated Infrastructure