Planning application · ABS/ENQ/2026/1247
Two replacement wind turbines proposed at Mill of Auchlin.
Mill Of Auchlin New Aberdour AB43 7LL
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
Overview
- Proposed
- Two replacement wind turbines and associated infrastructure
- Size
- 30 metres hub height · 43.5 metres total height
- Stage
- Decided on 4 Aug 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for two replacement wind turbines, with a hub height of 30 metres and a total height of 43.5 metres, plus associated infrastructure. The council record says the decision is “EIA Opinion Adopted”; it does not say planning permission was granted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/1247?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/1247. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Two replacement wind turbines are proposed.
- 02
The turbines would have a total height of 43.5 metres.
- 03
Associated infrastructure is proposed, but the record does not say what it includes.
Questions
Does the record say the turbines have planning permission?
No. The recorded decision is “EIA Opinion Adopted”; the record does not say planning permission was granted.
Tags
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”
- Wind Turbine
- “Erection of 2 Replacement Wind Turbines”
- Wind Turbine Count 2
- “2 Replacement Wind Turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 4 August 2026.
- Received15 Jul 2026
- Validated16 Jul 2026The council has everything it needs.
- Comments closed6 Aug 2026Usual deadline. Late comments may still count.
- Target decision16 Sept 20262-month target for local developments.
- Decision4 Aug 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/1247
- Address
- Mill Of Auchlin New Aberdour AB43 7LL
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Troup
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







