Planning applicationABS/ENQ/2026/1247

Mill Of Auchlin New Aberdour AB43 7LL

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

15 July 2026

Validated

16 July 2026

Planning Signals

3 detected traits

Specific
Associated InfrastructureWind TurbineWind Turbine Count 2
AI summary

Proposed erection of two replacement wind turbines (hub height 30m, total 43.5m) with infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/1247

Mill Of Auchlin New Aberdour AB43 7LL

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Proposed erection of two replacement wind turbines (hub height 30m, total 43.5m) with infrastructure.

Reference
ABS/ENQ/2026/1247
Address
Mill Of Auchlin New Aberdour AB43 7LL
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.6663
Longitude
-2.1448

Plain-language summary

Proposed erection of two replacement wind turbines (hub height 30m, total 43.5m) with infrastructure.

As filed with the council

Erection of 2 Replacement Wind Turbines (Hub Height 30 metres) Total Height 43.5 metres and Associated Infrastructure