Planning applicationAGB/25/01238/PP

Lochgair Church And Hall Lochgair Argyll And Bute PA31 8SB

DecidedWorth watchingInternal Works & Accessibility
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

25 July 2025

Validated

4 September 2025

Planning Signals

7 detected traits

Use
Place Of Worship
Works
Windows & Doors
Specific
Accessible WcCanopyChurch BuildingExternal Alterations
Application Insights

No form insights available yet.

AI summary

Church refurbishment with fabric repairs, a covered link walkway, new windows/doors, accessible toilets, internal rework and roof PV panels.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/25/01238/PP

Lochgair Church And Hall Lochgair Argyll And Bute PA31 8SB

DecidedInternal Works & AccessibilityReceived Argyll and Bute Council

Church refurbishment with fabric repairs, a covered link walkway, new windows/doors, accessible toilets, internal rework and roof PV panels.

Reference
AGB/25/01238/PP
Address
Lochgair Church And Hall Lochgair Argyll And Bute PA31 8SB
Status
Decided
Category
Internal Works & Accessibility
Impact scale
5/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
56.0626
Longitude
-5.3386

Plain-language summary

Church refurbishment with fabric repairs, a covered link walkway, new windows/doors, accessible toilets, internal rework and roof PV panels.

As filed with the council

Fabric repairs to existing church building, erection of covered link walkway, installation of replacement windows and doors, creation of internal doorway within existing window opening, creation of new window openings, formation of accessible sanitary accommodation, internal refurbishment, and installation of roof-mounted photovoltaic array