CityScope · Planning Updates
Application AGB/25/01860/PP
Land At Cruach A' Phubuill (Adjacent To Allt Dearg Windfarm) By Ardrishaig Lochgilphead Argyll And Bute
Proposed variation to extend the existing wind farms operating life to 2055, updating conditions for three turbines and associated control/ancillary infrastructure.
The record
- Reference
- AGB/25/01860/PP
- Address
- Land At Cruach A' Phubuill (Adjacent To Allt Dearg Windfarm) By Ardrishaig Lochgilphead Argyll And Bute
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Argyll and Bute Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.9335
- Longitude
- -5.4835
What is proposed
Plain-language summary
Proposed variation to extend the existing wind farms operating life to 2055, updating conditions for three turbines and associated control/ancillary infrastructure.
As filed with the council
Variation of Condition 2 of planning permission 13/01427/PP (Erection of 3 wind turbines (maximum blade tip height above ground level of 110m turbines 1 and 2 and 100m turbine 3) together with a control building, ancillary infrastructure including crane hard standings and access track and temporary ground works) to allow the development to operate to 31st December 2055