Planning application · AGB/25/02132/PP
Substation and ferry charging equipment proposed at Colintraive terminal.
The Ferry Terminal Colintraive Argyll and Bute PA22 3AP
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Cable Routing
- Substation
- Switchgear Switching Equipment Enclosure
Overview
Why it’s worth watching
Shore power infrastructure at a ferry terminal enables ferry charging and is a material change to local transport infrastructure.
- Proposed
- An SSEN substation, a low-voltage switchgear room, 6 subsurface cable ducts and a shore power arm.
- Size
- 6 subsurface cable ducts
- Stage
- Decided on 31 Mar 2026: Application Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes an SSEN substation and a low-voltage switchgear room at The Ferry Terminal. It also includes 6 subsurface cable ducts and a shore power arm to enable ferry charging.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.
Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application AGB/25/02132/PP?
Follow it on City Scope. This page is checked against the Argyll and Bute Council planning register and shows the latest status, decision and documents for AGB/25/02132/PP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Argyll and Bute Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A substation and low-voltage switchgear room would be erected at the ferry terminal.
- 02
6 subsurface cable ducts would be installed.
- 03
A shore power arm would be installed to enable ferry charging.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Cable Routing
- Substation
- Switchgear Switching Equipment Enclosure
What each tag is based on
- Cable Routing
- “Installation of 6 subsurface cable ducts”
- Substation
- “Erection of SSEN Substation”
- Switchgear Switching Equipment Enclosure
- “LV Switchgear room”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 31 March 2026.
- Received22 Dec 2025
- Validated2 Feb 2026The council has everything it needs.
- Comments closed23 Feb 2026Usual deadline. Late comments may still count.
- Target decision2 Apr 20262-month target for local developments.
- Decision31 Mar 2026Application Approved.
The record
- Reference
- AGB/25/02132/PP
- Address
- The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
- Status
- Decided
- Council decision
- Application Approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Argyll and Bute Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Cowal
Discussion