Planning applicationAGB/26/00791/NMA

Hoilday Hut Low Stillaig Millhouse Argyll And Bute

DecidedRoof Works & Dormers
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

7 May 2026

Validated

7 May 2026

Planning Signals

7 detected traits

Works
Facade / Exterior
Specific
New BuildAncillary Storage WorkspaceDormerNon Material VariationRooflights
AI summary

Non-material amendments to approved dwelling: revised cottage roof with dormers, updated finishes, added outbuilding rooflights, incl. solar PV roof pitch.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/26/00791/NMA

Hoilday Hut Low Stillaig Millhouse Argyll And Bute

DecidedRoof Works & DormersReceived Argyll and Bute Council

Non-material amendments to approved dwelling: revised cottage roof with dormers, updated finishes, added outbuilding rooflights, incl. solar PV roof pitch.

Reference
AGB/26/00791/NMA
Address
Hoilday Hut Low Stillaig Millhouse Argyll And Bute
Status
Decided
Category
Roof Works & Dormers
Impact scale
5/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
55.8575
Longitude
-5.3089

Plain-language summary

Non-material amendments to approved dwelling: revised cottage roof with dormers, updated finishes, added outbuilding rooflights, incl. solar PV roof pitch.

As filed with the council

Non Material Amendment to Planning Permission (23/01784/PP Erection of new dwellinghouse, alterations to existing dwellinghouse to create outbuilding to be used for purposes incidental to the new dwellinghouse, installation of sewage treatment plant and formation of vehicular access) A new roof structure is proposed on the existing cottage to match the existing roof ridge height, with two proposed monopitch dormers. The proposed roof finish is to match the proposed new-build slate roof. New rooflights are proposed in the outbuilding roof. The new-build dwelling now has a natural stone finish covering the whole of both gable-ends and south elevation. A white rendered finish is proposed on the north elevation. The new-build dwelling roof now has a 37° pitch to optimise the efficiency of the proposed solar PV array