Application DGY/25/1889/S42
Land At Cornharrow St John's Town Of Dalry Castle Douglas
Wind farm variation for up to 7 turbines with increased tip heights, plus battery storage, substation, access tracks and construction compounds.
The record
- Reference
- DGY/25/1889/S42
- Address
- Land At Cornharrow St John's Town Of Dalry Castle Douglas
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Dumfries and Galloway Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.1417
- Longitude
- -4.1676
What is proposed
Plain-language summary
Wind farm variation for up to 7 turbines with increased tip heights, plus battery storage, substation, access tracks and construction compounds.
As filed with the council
ERECTION OF A WIND FARM COMPRISING UP TO 7 TURBINES (MAXIMUM HEIGHT UP TO 180 METRES), THE FORMATION OF ACCESS TRACKS, BORROW PITS, TEMPORARY CONSTRUCTION COMPOUND, BATTERY STORAGE, ON-SITE SUBSTATION, AND ALL OTHER ASSOCIATED INFRASTRUCTURE AT VARIANCE WITH CONDITIONS 2 AND 13 OF PREVIOUSLY CONSENTED PERMISSION ATTACHED TO 22/2486/S42 (SCOTTISH GOVERNMENT PLANNING APPEAL REFERENCE PPA-170-2177) TO ALLOW AN INCREASE IN TURBINE TIP HEIGHTS FROM 200 METRES TO 220 METRES, AND ALLOW FOR AN AMENDED MICROSITING ALLOWANCE TO FACILITATE AN ALTERNATIVE LAYOUT (SECTION 42)