Planning applicationDGY/25/1889/S42

Land At Cornharrow St John's Town Of Dalry Castle Douglas

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

13 October 2025

Validated

13 October 2025

Planning Signals

8 detected traits

Specific
Associated InfrastructureRail InfrastructureRailway InfrastructureRailway StationSection 42 VariationSubstation
Application Insights

No form insights available yet.

AI summary

Wind farm variation for up to 7 turbines with increased tip heights, plus battery storage, substation, access tracks and construction compounds.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/25/1889/S42

Land At Cornharrow St John's Town Of Dalry Castle Douglas

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Wind farm variation for up to 7 turbines with increased tip heights, plus battery storage, substation, access tracks and construction compounds.

Reference
DGY/25/1889/S42
Address
Land At Cornharrow St John's Town Of Dalry Castle Douglas
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.1417
Longitude
-4.1676

Plain-language summary

Wind farm variation for up to 7 turbines with increased tip heights, plus battery storage, substation, access tracks and construction compounds.

As filed with the council

ERECTION OF A WIND FARM COMPRISING UP TO 7 TURBINES (MAXIMUM HEIGHT UP TO 180 METRES), THE FORMATION OF ACCESS TRACKS, BORROW PITS, TEMPORARY CONSTRUCTION COMPOUND, BATTERY STORAGE, ON-SITE SUBSTATION, AND ALL OTHER ASSOCIATED INFRASTRUCTURE AT VARIANCE WITH CONDITIONS 2 AND 13 OF PREVIOUSLY CONSENTED PERMISSION ATTACHED TO 22/2486/S42 (SCOTTISH GOVERNMENT PLANNING APPEAL REFERENCE PPA-170-2177) TO ALLOW AN INCREASE IN TURBINE TIP HEIGHTS FROM 200 METRES TO 220 METRES, AND ALLOW FOR AN AMENDED MICROSITING ALLOWANCE TO FACILITATE AN ALTERNATIVE LAYOUT (SECTION 42)