Planning applicationDGY/26/0072/FUL

Land To The South Of The Former Chapelcross Nuclear Power Station Near Annan

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

19 January 2026

Validated

13 February 2026

Planning Signals

7 detected traits

Specific
Electro Hydrogen Energy CentreHydrogen Production FacilityIndustrial LogisticsNew BuildParking AccessRenewable Energy Infrastructure
Application Insights

No form insights available yet.

AI summary

Plans for a green hydrogen production facility with electrolyser and storage areas, water treatment/SuDS ponds, plus parking, access and site buildings.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/0072/FUL

Land To The South Of The Former Chapelcross Nuclear Power Station Near Annan

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Plans for a green hydrogen production facility with electrolyser and storage areas, water treatment/SuDS ponds, plus parking, access and site buildings.

Reference
DGY/26/0072/FUL
Address
Land To The South Of The Former Chapelcross Nuclear Power Station Near Annan
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.0121
Longitude
-3.2192

Plain-language summary

Plans for a green hydrogen production facility with electrolyser and storage areas, water treatment/SuDS ponds, plus parking, access and site buildings.

As filed with the council

CONSTRUCTION AND OPERATION OF A GREEN HYDROGEN PRODUCTION FACILITY INCLUDING INSTALLATION OF ELECTROLYSER FACILITY, COMPRESSOR, GENERATOR AREAS, HYDROGEN STORAGE AND DRYING AREAS, WATER TREATMENT AREA, SUDS PONDS AND DRAINAGE, PARKING, HARDSTANDING AND ACCESS, TUBE TRAILER FILLING POINTS, SITE OFFICES, CONTROL ROOMS, WELFARE AREAS, LABS, STORES AND ASSOCIATED INFRASTRUCTURE