Ground-mounted solar panels and battery storage proposed at Chapelcroft Farm.
Chapelcroft Farm Lochmaben DG11 1LY
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Ancillary Structure
- Renewable Energy Infrastructure
- Switchgear Container
- Telecoms
Overview
- Today
- Agricultural land and farmyard
- Proposed
- Ground-mounted solar panels and a battery storage container
- Size
- 15 m² container plant room floorspace · 461 m² site area
- Stage
- Decided on 28 Aug 2026: Grant Conditionally.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes ground-mounted solar panel arrays and a container for battery storage and switchgear at Chapelcroft Farm. The form describes the current use as agricultural land and farmyard. The council’s record says the application was granted conditionally.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/1143/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/1143/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Ground-mounted solar panel arrays are proposed.
- 02
A container for battery storage and switchgear is proposed.
Questions
What is the proposed container for?
The form says it would contain batteries, switchgear and controls.
What has the council decided?
The council’s record says the application was granted conditionally.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Ancillary Structure
- Renewable Energy Infrastructure
- Switchgear Container
- Telecoms
What each tag is based on
- Ancillary Structure
- “"SITING OF STORAGE CONTAINER"”
- Renewable Energy Infrastructure
- “"ERECTION OF GROUND MOUNTED SOLAR PANELS"”, “"BATTERY STORAGE"”
- Switchgear Container
- “description: "...siting of storage container for use as battery storage and SWITCHGEAR"”
- Telecoms
- “No explicit telecoms equipment described in case file fields.”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 28 August 2026.
- Received30 Jun 2026
- Validated30 Jun 2026The council has everything it needs.
- Comments closed21 Jul 2026Usual deadline. Late comments may still count.
- Target decision30 Aug 20262-month target for local developments.
- Decision28 Aug 2026Grant Conditionally.
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- DGY/26/1143/FUL
- Address
- Chapelcroft Farm Lochmaben DG11 1LY
- Status
- Decided
- Council decision
- Grant Conditionally
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Annandale North