Planning application · DGY/26/1018/FUL
Two 100kW biomass boilers and a replacement flue at Raehills Estate.
Raehills Estate Biomass Plant Room St Annes Lockerbie DG11 1HL
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Biomass Energy
- Boiler Installation
- External Flue Installation
- Flues & Ventilation
Overview
- Today
- Existing biomass plant room, previously used for a combined heat and power system.
- Proposed
- Two 100kW woodchip biomass boilers and a replacement flue.
- Size
- 2 x 100kW boilers · 73.20 m² site area
- Stage
- Decided on 12 Aug 2026: Grant Unconditionally.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought permission to replace an existing biomass combined heat and power system with two 100kW woodchip boilers and a new flue, to provide heat to estate buildings. The plant room already exists, and the form says no additional construction is required. Work had started before the application was made. The council granted permission unconditionally.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/1018/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/1018/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Dumfries and Galloway Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The existing combined heat and power system is to be replaced with two biomass boilers.
- 02
A replacement flue is proposed.
Questions
Has work already started?
Yes. The form says work had started, with a start date of 09/09/2025.
What did the council decide?
The council granted permission unconditionally.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Flues & Ventilation
- Biomass Energy
- Boiler Installation
- External Flue Installation
What each tag is based on
- Biomass Energy
- “INSTALLATION OF 2 NO. 100KW BIOMASS BOILERS”
- Boiler Installation
- “INSTALLATION OF 2 NO. 100KW BIOMASS BOILERS”, “replacement flue and associated works”
- External Flue Installation
- “REPLACEMENT FLUE”
- Flues & Ventilation
- “REPLACEMENT FLUE”, “associated works”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 12 August 2026.
- Received9 Jun 2026
- Validated22 Jun 2026The council has everything it needs.
- Comments closed13 Jul 2026Usual deadline. Late comments may still count.
- Target decision22 Aug 20262-month target for local developments.
- Decision12 Aug 2026Grant Unconditionally.
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- DGY/26/1018/FUL
- Address
- Raehills Estate Biomass Plant Room St Annes Lockerbie DG11 1HL
- Status
- Decided
- Council decision
- Grant Unconditionally
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Annandale North
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.