Planning application · DGY/26/0353/FUL
5MW solar farm proposed beside Lockerbie Creamery.
Lockerbie Creamery Lockerbie DG11 1LW
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Access Roads
- Associated Infrastructure
- Boundary Treatment
- Cctv Installation
- Ground Mounted Solar Panels
Overview
Why it’s worth watching
A 5MW ground-mounted solar farm with substation, control room and security infrastructure at a named creamery site, a material renewable energy development.
- Today
- Three field parcels in arable use.
- Proposed
- A ground-mounted solar farm with associated equipment and works.
- Size
- 5 MW solar farm capacity · 10.70 ha site area · 2 metres high perimeter fencing
- Stage
- Past its target date of 9 Jul 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a ground-mounted solar farm on three field parcels currently used for arable farming. It would include inverters, a transformer substation, a control room, underground cables, access tracks, landscaping, perimeter fencing and pole-mounted CCTV cameras. The form says the permission sought would be temporary, for an operational lifespan of 35 years, plus 6 months for construction and decommissioning. The applicant had pre-application discussions with the council under reference 24/0183/MCE.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.
Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application DGY/26/0353/FUL?
Follow it on City Scope. This page is checked against the Dumfries and Galloway Council planning register and shows the latest status, decision and documents for DGY/26/0353/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Dumfries and Galloway Council planning portal.
On the street
What neighbours would notice.
- 01
The solar farm would be enclosed by perimeter fencing stated to be 2 metres high.
- 02
Pole-mounted CCTV cameras stated to be 5 metres high are proposed.
- 03
Access tracks would be formed within the site.
Questions
What is proposed on the site?
A ground-mounted solar farm with inverters, a transformer substation, a control room, underground cabling, access tracks and landscape works.
How long would the solar farm operate?
The form says the requested temporary permission covers an operational lifespan of 35 years, with an additional 6 months for construction and decommissioning. It says the equipment would be dismantled and removed at decommissioning, unless the lifetime is extended through a further planning application.
What happens next?
The application is at the assessment stage. The case gives no decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Boundary Treatment
- Landscaping
- Access Roads
- Associated Infrastructure
- Cctv Installation
- Ground Mounted Solar Panels
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Solar Farm
- Substation
What each tag is based on
- Access Roads
- “FORMATION OF ACCESS TRACKS”
- Associated Infrastructure
- “UNDERGROUND CABLING AND ASSOCIATED INFRASTRUCTURE”
- Boundary Treatment
- “2 METRE HIGH PERIMETER FENCING”
- Cctv Installation
- “5 METRE HIGH POLE MOUNTED CCTV CAMERAS”
- Ground Mounted Solar Panels
- “GROUND MOUNTED SOLAR”
- Landscaping
- “LANDSCAPE WORKS”
- Rail Infrastructure
- “Lockerbie Creamery Lockerbie DG11 1LW”
- Railway Infrastructure
- “Lockerbie Creamery Lockerbie DG11 1LW”
- Railway Station
- “Lockerbie Creamery Lockerbie DG11 1LW”
- Solar Farm
- “GROUND MOUNTED SOLAR FARM”
- Substation
- “SITING OF TRANSFORMER SUBSTATION”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received27 Feb 2026
- Validated9 Mar 2026The council has everything it needs.
- Comments closed30 Mar 2026Usual deadline. Late comments may still count.
- Target decision (next)9 Jul 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- DGY/26/0353/FUL
- Address
- Lockerbie Creamery Lockerbie DG11 1LW
- Status
- Assessment Stage
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Dumfries and Galloway Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Annandale North
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.