Planning applicationDGY/26/1675/S36

Proposed Quantans Hill Wind Farm North-East Of Carsphairn

Assessment StageWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,479 of 1,663 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 184 records from that period are still being added or checked.

Proposals and decisions come from Dumfries and Galloway Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 2
Received

25 September 2026

Validated

25 September 2026

Planning Signals

7 detected traits

Specific
Borrow PitMet MastSection 36 ConsentSubstationTemporary Construction CompoundWind Turbine
AI summary

Up to 14 turbines at 200m tip height, battery storage, substation, control building, anemometer mast, compounds, borrow pits and cables proposed at Quantans Hill.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application DGY/26/1675/S36

Proposed Quantans Hill Wind Farm North-East Of Carsphairn

Assessment StageRenewable Energy, EV & Heat PumpsReceived Dumfries and Galloway Council

Up to 14 turbines at 200m tip height, battery storage, substation, control building, anemometer mast, compounds, borrow pits and cables proposed at Quantans Hill.

Reference
DGY/26/1675/S36
Address
Proposed Quantans Hill Wind Farm North-East Of Carsphairn
Status
Assessment Stage
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Dumfries and Galloway Council
Received
Validated
Last scraped
Record created
Latitude
55.211699
Longitude
-4.259969

Plain-language summary

Up to 14 turbines at 200m tip height, battery storage, substation, control building, anemometer mast, compounds, borrow pits and cables proposed at Quantans Hill.

As filed with the council

CONSULTATION FROM SCOTTISH MINISTERS REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR ERECTION OF UP TO 14 WIND TURBINES (MAXIMUM TIP HEIGHT 200 METRES), BATTERY ENERGY STORAGE SYSTEM, SUBSTATION, CONTROL BUILDING, ANEMOMETER MAST, FORMATION OF COMPOUND, TEMPORARY CONSTRUCTION AND STORAGE COMPOUNDS AND BORROW PITS, UNDERGROUND CABLES AND ASSOCIATED WORKS (ADDITIONAL INFORMATION)