Planning application · FAL/P/25/0544/PPP
Green hydrogen plant proposed on land east of BOC in Grangemouth.
Land To East Of BOC Ltd Wholeflats Road Grangemouth
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Brownfield Redevelopment
- Demolition
- Electro Hydrogen Energy Centre
- Hydrogen Production Facility
Overview
Why it’s worth watching
A major energy-industrial proposal by RWE would materially change land near Grangemouth through demolition and construction of green hydrogen production infrastructure.
- Today
- Mostly disused brownfield land; part is used by industrial rental equipment and safety businesses.
- Proposed
- Demolition of existing buildings and structures, followed by an electrolyser plant and associated infrastructure.
- Size
- 9.20 ha site area
- Stage
- Past its target date of 19 Apr 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks planning permission in principle, which establishes whether development may go ahead before detailed plans are decided. It proposes demolishing existing buildings and structures and building, operating and later decommissioning an electrolyser plant capable of producing green hydrogen, with associated infrastructure. The site is north of Wholeflats Road, to the south-east of Grangemouth’s main residential area.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application FAL/P/25/0544/PPP?
Follow it on City Scope. This page is checked against the Falkirk Council planning register and shows the latest status, decision and documents for FAL/P/25/0544/PPP. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Falkirk Council planning portal.
On the street
What neighbours would notice.
- 01
Existing buildings and structures on the site would be demolished.
- 02
A new or altered vehicle access to a public road is proposed; its position is not given in the form text.
- 03
The proposal includes a surface water drainage system, an attenuation tank for on-site recycling and features such as swales.
Questions
What does planning permission in principle mean?
It asks whether the proposed development may go ahead in principle. This application does not provide a final detailed design.
What happens next?
The application is awaiting a decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Demolition
- Associated Infrastructure
- Brownfield Redevelopment
- Electro Hydrogen Energy Centre
- Hydrogen Production Facility
- Planning Permission In Principle
- Renewable Energy Infrastructure
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”
- Brownfield Redevelopment
- “Demolition of Existing Buildings and Structures”, “Land To East Of BOC Ltd Wholeflats Road Grangemouth”
- Demolition
- “Demolition of Existing Buildings and Structures”, “demolition”
- Electro Hydrogen Energy Centre
- “Electrolyser Plant, Capable of Producing Green Hydrogen”
- Hydrogen Production Facility
- “Construction, Operation and Decommissioning of an Electrolyser Plant, and Associated Infrastructure, Capable of Producing Green Hydrogen”
- Planning Permission In Principle
- “Reference number P/25/0544/PPP indicates a Planning Permission in Principle application”
- Renewable Energy Infrastructure
- “Green Hydrogen”, “Capable of Producing Green Hydrogen”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received5 Dec 2025
- Validated19 Dec 2025The council has everything it needs.
- Comments closed9 Jan 2026Usual deadline. Late comments may still count.
- Target decision (next)19 Apr 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Planning permission in principle
- Agrees that a type of development is acceptable on the site. The details come later in further applications.
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- FAL/P/25/0544/PPP
- Address
- Land To East Of BOC Ltd Wholeflats Road Grangemouth
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Falkirk Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







