Planning application · FIF/25/02265/CON
Fife Council consulted on proposed Windburn Wind Farm.
Scottish Government Consultation Fife
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
This is a useful source copy of a cross-boundary national energy proposal with substantial stated turbine and storage capacity. Keep Fife's role distinct from the councils whose areas contain the site; no ministerial outcome is established here.
- Proposed
- Windburn Wind Farm
- Type
- Conservation area consent
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a consultation on a Section 36 application for the proposed Windburn Wind Farm. The description places the wind farm in the planning authority areas of Clackmannanshire Council and Perth and Kinross Council.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/25/02265/CON?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/25/02265/CON. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind farm is proposed; the description does not give its layout or equipment details.
Tags
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “with turbines and associated infrastructure”
- Section 36 Consent
- “Section 36 Application”, “Scottish Government Consultation on Section 36 Application for proposed wind farm”
- Wind Turbine
- “proposed wind farm Windburn Wind Farm”, “with turbines and associated infrastructure”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received8 Aug 2025
- Validated8 Aug 2025The council has everything it needs.
- Comments closed29 Aug 2025Usual deadline. Late comments may still count.
- Target decision8 Oct 20252-month target for local developments.
- DecisionDecided
Linked applications (12)
Planning terms
- Conservation area consent
- Needed to demolish a building in a conservation area. Decided alongside any planning application.
The record
- Reference
- FIF/25/02265/CON
- Address
- Scottish Government Consultation Fife
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







