48MW wind farm proposed east of Hilton Farm.
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
Overview
Why it’s worth watching
This is a large renewable energy and battery storage scoping proposal with clear landscape and infrastructure implications for the Kelty area.
- Proposed
- A wind farm with 4 turbines and associated infrastructure, including a battery energy storage system (BESS).
- Size
- 4 proposed turbines · 200 m to tip maximum turbine height · 48 MW total site capacity
- Stage
- Decided on 6 Mar 2026: EIA Scoping Agreed.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks a scoping opinion for a wind farm and associated infrastructure on land east of Hilton Farm. A scoping opinion is the council’s view on what environmental issues should be assessed. The record does not give the details of Fife Council’s opinion.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/25/03400/SCO?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/25/03400/SCO. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes 4 wind turbines, each 200m to tip.
- 02
Associated infrastructure would include a battery energy storage system (BESS).
Questions
Is this an application for permission to build the wind farm?
The description is for a scoping opinion, not an application seeking permission to build. The record does not state what Fife Council decided.
Tags
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated infrastructure including BESS”, “associated infrastructure”
- Eia Scoping
- “Scoping opinion for erection of Wind Farm”, “scoping for Ore Energy Park wind farm”
- Wind Turbine
- “4 wind turbines (200m to tip)”, “Wind Farm comprising of 4 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 6 March 2026.
- Received12 Dec 2025
- Validated16 Dec 2025The council has everything it needs.
- Comments closed6 Jan 2026Usual deadline. Late comments may still count.
- Target decision16 Feb 20262-month target for local developments.
- Decision6 Mar 2026EIA Scoping Agreed.
The record
- Reference
- FIF/25/03400/SCO
- Status
- Decided
- Council decision
- EIA Scoping Agreed
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.