Planning application · FIF/26/01218/FULL
A 74-metre wind turbine proposed at Barnsmuir Farm.
Barnsmuir Farm Barnsmuir Crail Anstruther Fife KY10 3XB
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Renewable Energy Infrastructure
- Wind Turbine
Overview
- Today
- An existing wind turbine, approximately 45 metres to blade tip.
- Proposed
- A replacement wind turbine, 74 metres to blade tip, with associated works.
- Size
- 14.50 ha site area
- Stage
- Decided on 15 Jul 2026: Application Permitted with Conditions.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought to replace the existing wind turbine at Barnsmuir Farm with a single turbine reaching 74 metres to the blade tip. The existing turbine is described as approximately 45 metres to the tip. The proposal includes a new foundation, crane hardstanding and underground cabling, and would use existing access tracks. It amends an earlier permission, reference 11/05657/FULL; the council recorded the application as permitted with conditions.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/26/01218/FULL?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/26/01218/FULL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The existing turbine would be removed and replaced by a taller turbine.
- 02
Associated works include a new foundation, crane hardstanding and underground cabling.
- 03
Existing access tracks would be used.
Questions
What is changing from the earlier permission?
The application is an amendment to the earlier permission, reference 11/05657/FULL, for a replacement turbine.
Has the council made a decision?
The council recorded the application as permitted with conditions.
Was the turbine work already under way?
No. The form says the work had not started or been completed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Renewable Energy Infrastructure
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “and associated works”
- Renewable Energy Infrastructure
- “Erection of wind turbine (74 metres to blade tip)”
- Wind Turbine
- “Erection of wind turbine (74 metres to blade tip)”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 15 July 2026.
- Received27 Apr 2026
- Validated13 May 2026The council has everything it needs.
- Comments closed3 Jun 2026Usual deadline. Late comments may still count.
- Target decision13 Sept 20264-month target for major developments.
- Decision15 Jul 2026Application Permitted with Conditions.
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- FIF/26/01218/FULL
- Address
- Barnsmuir Farm Barnsmuir Crail Anstruther Fife KY10 3XB
- Status
- Decided
- Council decision
- Application Permitted with Conditions
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- East Neuk and Landward
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





