Planning application · HLD/25/02087/FUL
49.9MW battery energy storage system proposed near Geise Farm.
Land 775M SE Of Geise Farm Halkirk
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Landscaping
- Substation Connection Works
Overview
Why it’s worth watching
A 49.9MW battery energy storage scheme is a substantial energy infrastructure proposal with clear wider public consequence for the local grid.
- Proposed
- A 49.9MW battery energy storage system, landscaping and associated infrastructure, connected to Thurso South Substation.
- Size
- 49.9 MW bESS capacity
- Stage
- Past its target date of 5 Apr 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes constructing and operating a battery energy storage system (BESS) rated at 49.9MW. It also includes landscaping, associated infrastructure and a connection to Thurso South Substation.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02087/FUL?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02087/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
Construction work is proposed.
- 02
Landscaping is proposed.
Questions
What is a BESS?
It is a battery energy storage system.
Tags
- Landscaping
- Associated Infrastructure
- Substation Connection Works
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Landscaping
- “landscaping”
- Substation Connection Works
- “connection to the Thurso South Substation”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received3 Jun 2025
- Validated5 Feb 2026The council has everything it needs.
- Comments closed26 Feb 2026Usual deadline. Late comments may still count.
- Target decision (next)5 Apr 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- HLD/25/02087/FUL
- Address
- Land 775M SE Of Geise Farm Halkirk
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.