Application HLD/25/02087/FUL
Land 775M SE Of Geise Farm Halkirk
A proposed 49.9MW battery energy storage facility near Thurso South Substation, with landscaping, supporting infrastructure and a grid connection.
The record
- Reference
- HLD/25/02087/FUL
- Address
- Land 775M SE Of Geise Farm Halkirk
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 58.5575
- Longitude
- -3.5236
What is proposed
Plain-language summary
A proposed 49.9MW battery energy storage facility near Thurso South Substation, with landscaping, supporting infrastructure and a grid connection.
As filed with the council
Buckies BESS - Proposed construction and operation of Battery Energy Storage system of 49.9MW, with landscaping, associated infrastructure and connection to the Thurso South Substation