Land Approx 18 Km Southwest Of Lairg And 20 Km Northwest Of Bonar Bridge

Under ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

18 July 2025

Validated

18 July 2025

Planning Signals

6 detected traits

Specific
Rail InfrastructureRailway InfrastructureRailway StationSection 36 ConsentSubstationWind Turbine
Application Insights

No form insights available yet.

AI summary

Coille Beith wind farm proposed: up to 11 turbines (to 200m tip height), plus control building, substation, tracks and underground cabling for 50 years.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/02684/S36

Land Approx 18 Km Southwest Of Lairg And 20 Km Northwest Of Bonar Bridge

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Coille Beith wind farm proposed: up to 11 turbines (to 200m tip height), plus control building, substation, tracks and underground cabling for 50 years.

Reference
HLD/25/02684/S36
Address
Land Approx 18 Km Southwest Of Lairg And 20 Km Northwest Of Bonar Bridge
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.9503
Longitude
-4.6793

Plain-language summary

Coille Beith wind farm proposed: up to 11 turbines (to 200m tip height), plus control building, substation, tracks and underground cabling for 50 years.

As filed with the council

Coille Beith Wind Farm - Erection and operation of a wind farm for a period of 50 years, comprising up to 11 turbines with a maximum blade tip height of 200m, control building, substation, new access, tracks, watercourse crossings, borrow pits, underground cabling, construction compounds, laydown areas and ancillary infrastructure. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005173