Application HLD/25/03511/S36
Land 6000M W Of Findhorn Bridge At Glen Kyllachy Tomatin
Kyllachy wind farm proposes 13 turbines (up to 180m blade tip) plus BESS up to 22MW and grid infrastructure.
The record
- Reference
- HLD/25/03511/S36
- Address
- Land 6000M W Of Findhorn Bridge At Glen Kyllachy Tomatin
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.3228
- Longitude
- -4.0316
What is proposed
Plain-language summary
Kyllachy wind farm proposes 13 turbines (up to 180m blade tip) plus BESS up to 22MW and grid infrastructure.
As filed with the council
Kyllachy Wind Farm - 13 turbines up to 180m blade tip with overall capacity exceeding 50MW, Battery Energy Storage System (BESS) up to 22MW capacity and associated infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005153