Planning application · HLD/25/03511/S36
13 turbines up to 180m proposed at Kyllachy Wind Farm.
Land 6000M W Of Findhorn Bridge At Glen Kyllachy Tomatin
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
A major renewable energy proposal for 13 turbines up to 180m blade tip, over 50MW capacity and a 22MW battery storage system at Glen Kyllachy, Tomatin, with clear wider public and infrastructure significance.
- Proposed
- Kyllachy Wind Farm, a battery energy storage system and associated infrastructure
- Size
- 13 turbines
- Stage
- Past its target date of 16 Nov 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for Kyllachy Wind Farm, with 13 turbines up to 180m to blade tip, a battery energy storage system and associated infrastructure. The wind farm would have overall capacity exceeding 50MW, and the battery system would have capacity up to 22MW. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/03511/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/03511/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
The proposal includes 13 turbines up to 180m to blade tip.
- 02
A battery energy storage system with capacity up to 22MW and associated infrastructure are proposed.
Questions
Who will decide the application?
The Energy Consents Unit will determine it. The record gives reference ECU00005153 for searching its application site.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Section 36 Consent
- “consent under Section 36 is required”, “Energy Consents Unit”
- Wind Turbine
- “Kyllachy Wind Farm - 13 turbines”, “overall capacity exceeding 50MW”
- Wind Turbine Count 13 Or Up To 13
- “13 turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received16 Sept 2025
- Validated16 Sept 2025The council has everything it needs.
- Comments closed7 Oct 2025Usual deadline. Late comments may still count.
- Target decision (next)16 Nov 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- HLD/25/03511/S36
- Address
- Land 6000M W Of Findhorn Bridge At Glen Kyllachy Tomatin
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.