Planning applicationHLD/26/03831/FUL

Tigh A'Bhlair Culloden Moor Inverness IV2 5EH

Under ConsiderationRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

3 September 2026

Validated

11 September 2026

Planning Signals

1 detected trait

Specific
Householder Context
Application Insights

No form insights available yet.

AI summary

Installation of an air source heat pump with solar PV and battery at a dwelling.

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/03831/FUL

Tigh A'Bhlair Culloden Moor Inverness IV2 5EH

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Installation of an air source heat pump with solar PV and battery at a dwelling.

Reference
HLD/26/03831/FUL
Address
Tigh A'Bhlair Culloden Moor Inverness IV2 5EH
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
2/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.4795
Longitude
-4.0843

Plain-language summary

Installation of an air source heat pump with solar PV and battery at a dwelling.

As filed with the council

Installation of Air Source Heat Pump with Solar PV and Battery