Planning applicationHLD/25/03986/S37

Land 1525M SE Of Finglack Culloden Moor Inverness

DecidedWorth watchingNew-Build & Major Development
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

17 October 2025

Validated

17 October 2025

Planning Signals

5 detected traits

Specific
Associated InfrastructureOverhead Utility LinesSection 37 ConsentSteel Lattice Tower Replacement RemovalTransmission Substation Buildings
Application Insights

No form insights available yet.

AI summary

Proposed 400kV overhead line (~186km) between new substations near Beauly, New Deer and Peterhead, with steel towers, diversions and realignments.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/03986/S37

Land 1525M SE Of Finglack Culloden Moor Inverness

DecidedNew-Build & Major DevelopmentReceived The Highland Council

Proposed 400kV overhead line (~186km) between new substations near Beauly, New Deer and Peterhead, with steel towers, diversions and realignments.

Reference
HLD/25/03986/S37
Address
Land 1525M SE Of Finglack Culloden Moor Inverness
Status
Decided
Category
New-Build & Major Development
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created

Plain-language summary

Proposed 400kV overhead line (~186km) between new substations near Beauly, New Deer and Peterhead, with steel towers, diversions and realignments.

As filed with the council

Beauly to Peterhead 400 kV OHL - Install, operate and keep installed 186km of new 400 kV overhead transmission line (OHL), supported on steel lattice tower structures, between proposed new substations at Fanellan (NH 48321 42717) in the area of Beauly, Greens (NJ 81960 47587) in the area of New Deer and Netherton (NK 05761 45576) in the area of Peterhead; associated crossing works, temporary diversions and permanent realignment to 14.7 km of existing 132 kV and 275 kV OHLs, and ancillary development and associated works. This case will be determined by the Energy Consents Unit Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00005221&T=5 using reference number ECU00005165