Planning application · HLD/25/04675/S36
Six turbines proposed for Golticlay Extension Wind Farm.
Land 1120M SE Of Achvanich Farmhouse Latheron
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- House Extension
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
This is a Section 36 application for a six-turbine wind farm extension with battery storage and 40-year operational life, a material renewable energy proposal.
- Proposed
- A wind farm with six turbines, a battery energy storage system and associated infrastructure
- Size
- 6 wind turbines · 40 years proposed operating period
- Stage
- Past its target date of 5 Feb 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a wind farm with six wind turbines, a battery energy storage system and associated infrastructure. It seeks permission to build and operate the wind farm for 40 years. The site is east of the A9, about 6 km north of Latheron and 18 km south-west of Wick. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04675/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04675/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
Six wind turbines are proposed, with a maximum blade tip height of up to 180 metres.
- 02
A battery energy storage system and associated infrastructure are proposed.
Questions
Who will decide the application?
The Energy Consents Unit will determine it.
Where can I find the application?
The description directs readers to the Energy Consents Unit website and gives reference ECU00006095.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “and associated infrastructure”
- House Extension
- “extension”
- Section 36 Consent
- “25/04675/S36”, “determined by the Energy Consents Unit”
- Wind Turbine
- “comprising 6 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received5 Dec 2025
- Validated5 Dec 2025The council has everything it needs.
- Comments closed26 Dec 2025Usual deadline. Late comments may still count.
- Target decision (next)5 Feb 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- HLD/25/04675/S36
- Address
- Land 1120M SE Of Achvanich Farmhouse Latheron
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.