Land 1120M SE Of Achvanich Farmhouse Latheron
Golticlay wind farm planned with up to 6 turbines (blade tip ~180m) plus BESS and infrastructure, for up to 40 years.
The record
- Reference
- HLD/25/04675/S36
- Address
- Land 1120M SE Of Achvanich Farmhouse Latheron
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 58.3447
- Longitude
- -3.377
What is proposed
Plain-language summary
Golticlay wind farm planned with up to 6 turbines (blade tip ~180m) plus BESS and infrastructure, for up to 40 years.
As filed with the council
Golticlay Extension Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising 6 wind turbines with a maximum blade tip height of up to 180 metres, Battery Energy Storage System (BESS) and associated infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006095