Planning application · HLD/25/04677/SCOP
Up to 13 wind turbines in plans for Glenkirk Wind Farm.
Land 2130M NE Of Balvraid Lodge Tomatin
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
This is a scoping application for a substantial 13-turbine wind farm with associated infrastructure and decommissioning, representing significant renewable energy development.
- Proposed
- A generating station with up to 13 wind turbines, associated infrastructure, operation and later decommissioning.
- Stage
- Council responded on 22 Jan 2026: Scoping Application Decision Issued.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application concerns Glenkirk Wind Farm, a generating station with up to 13 wind turbines. The description also includes associated infrastructure, operation and later decommissioning.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04677/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04677/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The plans include up to 13 wind turbines, with blade tip heights up to 230m.
Tags
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- “and associated infrastructure”
- Eia Scoping
- “25/04677/SCOP”, “Glenkirk Wind Farm”
- Wind Turbine
- “up to 13 wind turbines (blade tip height up to 230m)”
- Wind Turbine Count 13 Or Up To 13
- “up to 13 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 22 January 2026.
- Received5 Dec 2025
- Validated5 Dec 2025The council has everything it needs.
- Comments closed26 Dec 2025Usual deadline. Late comments may still count.
- Target decision5 Feb 20262-month target for local developments.
- Decision22 Jan 2026Scoping Application Decision Issued.
The record
- Reference
- HLD/25/04677/SCOP
- Address
- Land 2130M NE Of Balvraid Lodge Tomatin
- Status
- Decided
- Council decision
- Scoping Application Decision Issued
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







