CityScope · Planning Updates
Application HLD/26/01345/FUL
Land 600M NW Of Mybster Farm Watten
Up to 19.8MW battery storage facility with electrical control buildings, container units and associated site infrastructure.
The record
- Reference
- HLD/26/01345/FUL
- Address
- Land 600M NW Of Mybster Farm Watten
- Status
- Withdrawn
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
What is proposed
Plain-language summary
Up to 19.8MW battery storage facility with electrical control buildings, container units and associated site infrastructure.
As filed with the council
Formation of a battery storage facility with a capacity of up to 19.8MW and associated infrastructure