Planning application · HLD/26/04462/FUL
3 wind turbines proposed on the Isle of Eigg.
Wind Farm Site Isle Of Eigg
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 3
Overview
Why it’s worth watching
A multi-turbine wind development on an island with defined heights, infrastructure and landscape visualisations.
- Today
- Grazed land forming part of an existing wind farm
- Proposed
- 3 wind turbines and associated infrastructure
- Size
- 23 m maximum hub height · 39.5 m maximum tip height · 20 years operating period before decommissioning
- Stage
- Comments closed. Decision due by 2 Mar 2027.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes 3 wind turbines, with associated infrastructure, on land to the west of Galmisdale, Isle of Eigg. The site is described as grazed land forming part of an existing wind farm. The permission sought is temporary: the form says the development is expected to operate for 20 years before being decommissioned. The application also refers to earlier pre-application advice and an EIA screening request.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/04462/FUL?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/04462/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
The proposal includes 3 wind turbines, with a maximum tip height of 39.5m.
- 02
The form says a new or altered vehicle access to or from a public road is proposed.
Questions
What earlier applications are mentioned?
The form refers to pre-application advice under 24/04279/PREAPP and an EIA screening request under 26/00112/SCRE.
What happens next?
The application is under consideration by The Highland Council. The form says an EIA screening opinion was issued, confirming that the proposal does not comprise EIA development.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 3
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Wind Turbine
- “Erection of 3 wind turbines”
- Wind Turbine Count 3
- “3 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 2 March.
- Received9 Oct 2026
- Validated30 Oct 2026The council has everything it needs.
- Comments closed20 Nov 2026Usual deadline. Late comments may still count.
- Target decision (next)2 Mar 20274-month target for major developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- HLD/26/04462/FUL
- Address
- Wind Farm Site Isle Of Eigg
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.