Planning application · MID/25/00521/DPP
Relief road and link road proposed between the A701 and A702.
Land between The A701 and A702
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Parking, Access & Highways
- Large 8/10
- Associated Infrastructure
- Civil Works
- Drainage Wastewater Infrastructure
- Road Layout
Overview
Why it’s worth watching
Major new road infrastructure proposal with relief road, link road, roundabouts and EIA across a wide area.
- Proposed
- A701 relief road, A702 link road, roundabouts and drainage infrastructure
- Type
- Detailed planning permission
- Stage
- Past its target date of 13 Dec 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes an A701 relief road and an A702 link road, with new roundabouts and changes to an existing roundabout. It also includes drainage infrastructure, including SUDS basins—features designed to manage surface water. An environmental impact assessment report has been submitted.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application MID/25/00521/DPP?
Follow it on City Scope. This page is checked against the Midlothian Council planning register and shows the latest status, decision and documents for MID/25/00521/DPP. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Midlothian Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A relief road and link road would be formed between the A701 and A702.
- 02
Two roundabouts would be constructed, and an existing roundabout would be altered.
- 03
Drainage infrastructure, including SUDS basins, would be formed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Civil Works
- Drainage Wastewater Infrastructure
- Road Layout
What each tag is based on
- Associated Infrastructure
- “associated works”
- Civil Works
- “Formation of A701 relief road and A702 link road, construction of 2 roundabouts, alteration to existing roundabout, formation of drainage infrastructure including SUDS basins”
- Drainage Wastewater Infrastructure
- “formation of drainage infrastructure including SUDS basins”
- Road Layout
- “Formation of A701 relief road and A702 link road, construction of 2 roundabouts, alteration to existing roundabout”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received1 Oct 2025
- Validated13 Oct 2025The council has everything it needs.
- Comments closed3 Nov 2025Usual deadline. Late comments may still count.
- Target decision (next)13 Dec 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- MID/25/00521/DPP
- Address
- Land between The A701 and A702
- Status
- Awaiting decision
- Category
- Parking, Access & Highways
- Impact scale
- 8/10
- Authority
- Midlothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.






