Planning application · MID/26/00558/PAC
Up to nine turbines proposed in Bowbeat Hill wind farm repowering.
Land At Bowbeat Hill Moorfoot Hills Midlothian
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Proposal Of Application Notice
- Renewable Energy Infrastructure
- Wind Turbine
Overview
Why it’s worth watching
This is a large renewable energy repowering with substantial turbine heights and battery storage, a material infrastructure change with clear public consequence despite being a proposal of application notice.
- Proposed
- Repowering with up to nine turbines, associated infrastructure and a BESS.
- Stage
- Council responded on 29 Oct 2026: Pre-application Consultation agreed.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a proposal of application notice for repowering the wind farm at Bowbeat Hill. It describes up to nine turbines, with no more than one within Midlothian Council’s area, plus associated infrastructure and a battery energy storage system (BESS). The council’s recorded decision is “Pre-application Consultation agreed”; this record does not give a planning permission decision.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application MID/26/00558/PAC?
Follow it on City Scope. This page is checked against the Midlothian Council planning register and shows the latest status, decision and documents for MID/26/00558/PAC. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Midlothian Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Wind turbines are proposed, with a maximum tip height of up to 230m.
- 02
Associated ancillary infrastructure is proposed; the record does not specify what it includes.
- 03
A battery energy storage system is proposed; the record does not give its size or location.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Proposal Of Application Notice
- Renewable Energy Infrastructure
- Wind Turbine
What each tag is based on
- Proposal Of Application Notice
- “Proposal of application notice for repowering of wind farm”
- Renewable Energy Infrastructure
- “repowering of wind farm”, “Battery Energy Storage System (BESS)”
- Wind Turbine
- “repowering of wind farm”, “installation of up to 9 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 29 October 2026.
- Received9 Oct 2026
- Validated9 Oct 2026The council has everything it needs.
- Comments closed30 Oct 2026Usual deadline. Late comments may still count.
- Target decision9 Dec 20262-month target for local developments.
- Decision29 Oct 2026Pre-application Consultation agreed.
Linked application
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- MID/26/00558/PAC
- Address
- Land At Bowbeat Hill Moorfoot Hills Midlothian
- Status
- Decided
- Council decision
- Pre-application Consultation agreed
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Midlothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.