Planning application · MID/26/00614/SCO
Up to 9 turbines in Bowbeat Wind Farm scoping application.
Land At Bowbeat Hill Moorfoot Hills Midlothian
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Eia Scoping
- Renewable Energy Infrastructure
- Wind Turbine
Overview
Why it’s worth watching
EIA scoping for a major wind farm repowering with nine turbines, battery storage and over 50MW capacity, representing significant renewable energy infrastructure change.
- Proposed
- Construction and operation of up to 9 turbines, battery energy storage and ancillary infrastructure.
- Size
- 230 m maximum blade tip height
- Stage
- Comments closed. Decision due by 26 Dec 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asks Midlothian Council for an EIA scoping opinion: a view on what an environmental impact assessment should cover. The assessment relates to construction and operation of a repowered Bowbeat Wind Farm, with turbines, battery energy storage and supporting infrastructure. The description gives a maximum blade tip height of 230m and says the combined capacity would exceed 50MW.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application MID/26/00614/SCO?
Follow it on City Scope. This page is checked against the Midlothian Council planning register and shows the latest status, decision and documents for MID/26/00614/SCO. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Midlothian Council planning portal.
On the street
What neighbours would notice.
- 01
The scheme includes up to 9 wind turbines, with a maximum blade tip height of 230m.
- 02
Battery energy storage and ancillary infrastructure are included; the description does not say where they would be located.
Questions
Is this the final application to build the wind farm?
The description is for an EIA scoping opinion. It concerns what the environmental assessment should cover, rather than giving details of a final build application.
Tags
- Eia Scoping
- Renewable Energy Infrastructure
- Wind Turbine
What each tag is based on
- Eia Scoping
- “EIA Scoping Opinion”
- Renewable Energy Infrastructure
- “construction and operation of the repowered Bowbeat Wind Farm”
- Wind Turbine
- “repowered Bowbeat Wind Farm comprising up to 9 turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 26 December.
- Received26 Oct 2026
- Validated26 Oct 2026The council has everything it needs.
- Comments closed16 Nov 2026Usual deadline. Late comments may still count.
- Target decision (next)26 Dec 20262-month target for local developments.
- DecisionNot yet
Linked application
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- MID/26/00614/SCO
- Address
- Land At Bowbeat Hill Moorfoot Hills Midlothian
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Midlothian Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.