Skip to content

Planning application · MID/26/00614/SCO

MID/26/00614/SCOAwaiting decisionWorth watching

Up to 9 turbines in Bowbeat Wind Farm scoping application.

Land At Bowbeat Hill Moorfoot Hills Midlothian

Midlothian Council

Free with a City Scope account. One email, when the council decides.

Also email me new applications nearby · £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Major 9/10
Tags
  • Eia Scoping
  • Renewable Energy Infrastructure
  • Wind Turbine

Overview

Why it’s worth watching

EIA scoping for a major wind farm repowering with nine turbines, battery storage and over 50MW capacity, representing significant renewable energy infrastructure change.

Proposed
Construction and operation of up to 9 turbines, battery energy storage and ancillary infrastructure.
Size
230 m maximum blade tip height
Stage
Comments closed. Decision due by 26 Dec 2026.

The council writes only to properties within 20 metres of an application site. Who is told

C - location plan

In plain English

The application asks Midlothian Council for an EIA scoping opinion: a view on what an environmental impact assessment should cover. The assessment relates to construction and operation of a repowered Bowbeat Wind Farm, with turbines, battery energy storage and supporting infrastructure. The description gives a maximum blade tip height of 230m and says the combined capacity would exceed 50MW.

Written with AI from the application form and the council record.

Keep reading

Track this application

How do I track planning application MID/26/00614/SCO?

Follow it on City Scope. This page is checked against the Midlothian Council planning register and shows the latest status, decision and documents for MID/26/00614/SCO. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Midlothian Council planning portal.