Planning application · SHE/2025/317/PPF

SHE/2025/317/PPFDecidedWorth watching

2 wind turbines proposed at Sullom Voe Terminal.

Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

Shetland North ward · Shetland Islands Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 8/10
Tags
  • Associated Infrastructure
  • Wind Turbine
  • Wind Turbine Count 2

Overview

Why it’s worth watching

Two large turbines at a major Shetland industrial terminal represent significant energy infrastructure with clear public consequence and scale.

Today
Land within the western part of Sullom Voe Terminal, with adjoining land to the south and west of the terminal boundary.
Proposed
2 wind turbines and associated infrastructure within the western part of the terminal. Peat restoration works are proposed on adjoining land to the south and west.
Size
2 turbines · 85 metres maximum hub height · 149.9 metres maximum blade tip height
Stage
Decided on 27 Aug 2026: Grant subject to conditions.

The council writes only to properties within 20 metres of an application site. Who is told

Proposed site plan wtg1

In plain English

The application proposed 2 wind turbines at Sullom Voe Terminal, each with generating capacity of up to 4.8 MW. The maximum hub height is 85 metres and the maximum blade tip height is 149.9 metres. The application form says the turbines are expected to generate electricity for approximately 25 years, after which they would be decommissioned and the site restored. The council granted permission subject to conditions; the application was preceded by EIA screening under reference 2024/265/SCR, which concluded the proposal was not EIA Development.

Written with AI from the application form and the council record.

Keep reading

Official records · analysis in progress

380 of 380 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.

Proposals and decisions come from Shetland Islands Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application SHE/2025/317/PPF?

Follow it on City Scope. This page is checked against the Shetland Islands Council planning register and shows the latest status, decision and documents for SHE/2025/317/PPF. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Shetland Islands Council planning portal.

Set up a planning alert