Nine turbines up to 180m proposed for Clyde South Wind Farm.
Land 1.1km NNE Of Wintercleugh House Daer Water Elvanfoot Biggar
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Eia Scoping
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
Section 36 scoping request for the Clyde South Wind Farm proposes nine 180m turbines with associated solar array and battery storage, a major renewable energy development with clear public interest.
- Proposed
- Clyde South Wind Farm with 9 turbines, a solar array and a battery energy storage system
- Size
- 9 turbines · 180 m maximum turbine height
- Stage
- Council responded on 25 Nov 2025: Scoping opinion adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a Section 36 scoping request for Clyde South Wind Farm, with turbines, a solar array and a battery energy storage system. South Lanarkshire Council adopted a scoping opinion. The record does not give a planning permission decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/25/1336?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/25/1336. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The request includes 9 turbines, up to 180m high.
- 02
An associated solar array and battery energy storage system are included.
Questions
What has the council decided?
It adopted a scoping opinion. The record does not state that planning permission has been granted.
What does BESS mean?
It means battery energy storage system.
Tags
- Associated Infrastructure
- Eia Scoping
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated Solar Arrey and BESS”
- Eia Scoping
- “Section 36 Scoping Request”
- Section 36 Consent
- “Section 36 Scoping Request”
- Wind Turbine
- “9 Turbines to a maximum height of 180m”
As lodged
The drawings.
Where it’s at
The council has responded on 25 November 2025.
- Received10 Nov 2025
- Validated12 Nov 2025The council has everything it needs.
- Comments closed3 Dec 2025Usual deadline. Late comments may still count.
- Target decision12 Jan 20262-month target for local developments.
- Decision25 Nov 2025Scoping opinion adopted.
The record
- Reference
- SLK/P/25/1336
- Address
- Land 1.1km NNE Of Wintercleugh House Daer Water Elvanfoot Biggar
- Status
- Decided
- Council decision
- Scoping opinion adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.