115m wind turbine and 10MW battery storage proposed at Cloburn Quarry.
Cloburn Quarry A73 From Symington A72 To Hyndford Bridge Thankerton Biggar ML11 8SR
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Eia Screening
- Renewable Energy Infrastructure
- Wind Turbine
- Wind Turbine Count 1
Overview
Why it’s worth watching
A 115m turbine and 10MW battery storage scheme at a quarry is a large renewable-energy proposal with clear landscape and infrastructure implications.
- Proposed
- A wind turbine with a 115m blade-tip height and an associated 10MW BESS.
- Size
- 115 m turbine height to blade tip · 10 MW bESS capacity
- Stage
- Council responded on 3 Nov 2026: Screening opinion - EIA not required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a request for an environmental impact assessment (EIA) screening opinion for a wind turbine and battery energy storage system (BESS). The council decided that an EIA is not required. This is a screening decision, not a decision on a full planning application; the submitted material says further assessments would accompany that application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/1060?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/1060. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind turbine and BESS are proposed at Cloburn Quarry.
- 02
The turbine is described as 115m to blade tip.
- 03
The submitted material anticipates construction noise and vibration. It says work would usually take place between 08:00 and 18:00 Monday to Friday and between 08:00 and 13:00 on Saturday, with no work on Sunday or Public Holidays without formal agreement with the Council.
Questions
What has the council decided?
It issued a screening opinion that an EIA is not required. This does not decide whether the development itself will be approved.
What happens next?
The submitted material says a full planning application would include further assessments, including a noise impact assessment.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Eia Screening
- Renewable Energy Infrastructure
- Wind Turbine
- Wind Turbine Count 1
What each tag is based on
- Eia Screening
- “EIA Screening Request”
- Renewable Energy Infrastructure
- “Erection of Single Wind Turbine”, “associated 10MW BESS”
- Wind Turbine
- “Erection of Single Wind Turbine (115m to Blade Tip)”
- Wind Turbine Count 1
- “Single Wind Turbine”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 3 November 2026.
- Received17 Aug 2026
- Validated19 Aug 2026The council has everything it needs.
- Comments closed9 Sept 2026Usual deadline. Late comments may still count.
- Target decision19 Oct 20262-month target for local developments.
- Decision3 Nov 2026Screening opinion - EIA not required.
The record
- Reference
- SLK/P/26/1060
- Address
- Cloburn Quarry A73 From Symington A72 To Hyndford Bridge Thankerton Biggar ML11 8SR
- Status
- Decided
- Council decision
- Screening opinion - EIA not required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Clydesdale East