Planning application · SLK/P/26/0329
A 47m wind turbine proposed to replace the existing turbine at Draffanmuir Farm.
Draffanmuir Farm Larkhall ML9 3DQ
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Wind Turbine
Overview
Why it’s worth watching
Proposed replacement and enlargement of a wind turbine from 50kW/35m to 225kW/47m at Draffanmuir Farm, Larkhall.
- Today
- Existing 35m-high, 50Kw wind turbine
- Proposed
- Replacement 47m-high, 225Kw wind turbine
- Size
- 35 m existing turbine height · 47 m replacement turbine height · 50 Kw existing turbine capacity
- Stage
- Decided on 31 Jul 2026: Application approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposed replacing the existing 35m-high turbine with a 47m-high turbine. The existing turbine is described as 50Kw, and the replacement as 225Kw. The council has approved the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0329?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0329. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The existing wind turbine would be replaced by a taller turbine.
Questions
Has the application been decided?
Yes. The application is recorded as approved.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Wind Turbine
What each tag is based on
- Wind Turbine
- “Replacement of the existing 35m high wind turbine (50Kw) with a 47m high wind turbine (225Kw)”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 31 July 2026.
- Received13 Mar 2026
- Validated30 Mar 2026The council has everything it needs.
- Comments closed20 Apr 2026Usual deadline. Late comments may still count.
- Target decision30 May 20262-month target for local developments.
- Decision31 Jul 2026Application approved.
The record
- Reference
- SLK/P/26/0329
- Address
- Draffanmuir Farm Larkhall ML9 3DQ
- Status
- Decided
- Council decision
- Application approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Clydesdale South
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





