Planning applicationSLK/P/26/0443

Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.

Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

9 April 2026

Validated

9 April 2026

Planning Signals

4 detected traits

Specific
Associated InfrastructureSection 36 ConsentWind TurbineWind Turbine Count 13 Or Up To 13
AI summary

Proposed 13 wind turbines (up to 240m), with battery storage and grid infrastructure under Section 36 consultation.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SLK/P/26/0443

Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire

RegisteredRenewable Energy, EV & Heat PumpsReceived South Lanarkshire Council

Proposed 13 wind turbines (up to 240m), with battery storage and grid infrastructure under Section 36 consultation.

Reference
SLK/P/26/0443
Address
Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
South Lanarkshire Council
Received
Validated
Last scraped
Record created

Plain-language summary

Proposed 13 wind turbines (up to 240m), with battery storage and grid infrastructure under Section 36 consultation.

As filed with the council

Erection of 13 turbines with a maximum blade tip height of up to 240 metres, a Battery Energy Storage System and associated infrastructure (section 36 consultation)