Planning application · SLK/P/26/0443
13 turbines and battery storage proposed at Watchman Energy Park.
Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
This is a large-scale energy development with significant landscape, infrastructure and community implications for the Elvanfoot area.
- Proposed
- 13 turbines, battery storage and associated infrastructure
- Size
- 13 turbines
- Stage
- Decided on 12 Aug 2026: Consultation response issued.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The proposal is for 13 turbines, a Battery Energy Storage System and associated infrastructure at Watchman Energy Park. The turbines would have a maximum blade tip height of up to 240 metres. This is a section 36 consultation; the council records that it issued a consultation response.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0443?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0443. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes 13 turbines, with blade tips up to 240 metres high.
- 02
A Battery Energy Storage System and associated infrastructure are proposed.
Questions
What has the council decided?
The record says a consultation response was issued. It does not state that planning permission was granted.
Tags
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Section 36 Consent
- “section 36 consultation”
- Wind Turbine
- “Erection of 13 turbines”
- Wind Turbine Count 13 Or Up To 13
- “13 turbines”
As lodged
The drawings.
Where it’s at
The council has decided on 12 August 2026.
- Received9 Apr 2026
- Validated9 Apr 2026The council has everything it needs.
- Comments closed30 Apr 2026Usual deadline. Late comments may still count.
- Target decision9 Jun 20262-month target for local developments.
- Decision12 Aug 2026Consultation response issued.
The record
- Reference
- SLK/P/26/0443
- Address
- Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire
- Status
- Unknown
- Council decision
- Consultation response issued
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





