Planning application · SLK/P/26/0761
50KW solar array and 100KW battery storage at Collierhall Farm.
Collierhall Farm Collierhall Road Douglas Water Lanark ML11 9TU
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Associated Infrastructure
- Battery Storage 100kw
- Ground Mounted Solar Panels
- Renewable Energy Infrastructure
Overview
- Proposed
- A ground-mounted solar array, battery storage system and associated infrastructure for on-site energy supply.
- Size
- 100 KW battery storage
- Stage
- Decided on 25 Sept 2026: Application approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application was for a ground-mounted solar array, a battery storage system and associated infrastructure for on-site energy supply at Collierhall Farm. The application was approved.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0761?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0761. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A ground-mounted solar array would be installed at the site.
- 02
A 100KW battery storage system and associated infrastructure are proposed; the description does not give their locations.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Battery Storage 100kw
- Ground Mounted Solar Panels
- Renewable Energy Infrastructure
What each tag is based on
- Associated Infrastructure
- “description: "...with associated infrastructure for on-site energy supply."”
- Battery Storage 100kw
- “ai_summary: "100KW battery storage system"”, “description: "100KW battery storage system"”
- Ground Mounted Solar Panels
- “ai_summary: "50kW ground-mounted solar array"”
- Renewable Energy Infrastructure
- “description: "Installation of 50KW (ground mounted) solar array, 100KW battery storage system with associated infrastructure for on-site energy supply."”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 25 September 2026.
- Received17 Jun 2026
- Validated29 Jul 2026The council has everything it needs.
- Comments closed19 Aug 2026Usual deadline. Late comments may still count.
- Target decision29 Sept 20262-month target for local developments.
- Decision25 Sept 2026Application approved.
The record
- Reference
- SLK/P/26/0761
- Address
- Collierhall Farm Collierhall Road Douglas Water Lanark ML11 9TU
- Status
- Decided
- Council decision
- Application approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Clydesdale South
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.