Skip to content

Planning application · SLK/P/26/0761

SLK/P/26/0761Decided

50KW solar array and 100KW battery storage at Collierhall Farm.

Collierhall Farm Collierhall Road Douglas Water Lanark ML11 9TU

Clydesdale South ward · South Lanarkshire Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Small 4/10
Tags
  • Associated Infrastructure
  • Battery Storage 100kw
  • Ground Mounted Solar Panels
  • Renewable Energy Infrastructure

Overview

Proposed
A ground-mounted solar array, battery storage system and associated infrastructure for on-site energy supply.
Size
100 KW battery storage
Stage
Decided on 25 Sept 2026: Application approved.

The council writes only to properties within 20 metres of an application site. Who is told

In plain English

The application was for a ground-mounted solar array, a battery storage system and associated infrastructure for on-site energy supply at Collierhall Farm. The application was approved.

Written with AI from the application form and the council record.

Keep reading

Official records · coverage in progress

1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.

Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application SLK/P/26/0761?

Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0761. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.

Set up a planning alert